SGI Ethernet Card Dokumentacja Strona 129

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 154
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 128
SG Series Programming Calibration
M550129-03 Rev G 7-7
7.6 CURRENT PROGRAMMING CALIBRATION
(ETHERNET)
Preparation:
1. Power down the Unit Under Test (UUT) and remove the input power for
safety.
2. Allow 5 minutes for the energy in the output to bleed down to a safe level.
3. Attach the precision shunt between the power supply’s output terminals.
4. Attach the voltmeter across the shunt.
5. Apply input power and power up the UUT.
6. After the UUT has initialized, begin the calibration procedure.
STEP DESCRIPTION
1. Issue a *CLS command.
2. Issue a *RST command.
3. Program the overvoltage protection to maximum to prevent nuisance trips:
CAL:OUTP:VOLT:PROT:DAC 65535
4. Program the output voltage to full scale to prevent Constant-Voltage
operation:
CAL:OUTP:VOLT:DAC 65535
5. Program the output of the first calibration point by sending the following
command string from the computer:
CAL:OUTP:CURR:DAC 3275
6. Let the output settle and measure the output current with the current shunt
and the high precision voltmeter; this is value 1.
7. Enter the actual output current of the first calibration point:
CAL:OUTP:CURR:FIVEPOINT 1 <value 1>
8. Program the output of the second calibration point by sending the following
command string from the computer:
CAL:OUTP:CURR:DAC 19000
9. Let the output settle and measure the output current with the current shunt
and the high precision voltmeter; this is value 2.
10. Enter the actual output current of the second calibration point:
CAL:OUTP:CURR:FIVEPOINT 2 <value 2>
Przeglądanie stron 128
1 2 ... 124 125 126 127 128 129 130 131 132 133 134 ... 153 154

Komentarze do niniejszej Instrukcji

Brak uwag